Sea Tower
Engelandlaan,
Zoetermeer
150 apartments
2025 - 2026
Special
roof caps
Sea Tower
The Sea Tower is a new residential tower in the centre of Zoetermeer, comprising 150 apartments spread over 22 floors. These are largely studio apartments in the affordable segment, with some – from the fourteenth floor upwards – featuring a separate bedroom. Standing 70 metres tall, it is a welcome addition to the city’s skyline and brings a sense of vibrancy to the town centre – one of the objectives of Zoetermeer Council.
Architectural firms Wim van Es and CB5 designed the building; the developer is Bakkers|Hommen Waerdevast and the main contractor is Kondor Wessels Amsterdam. Rodrie is involved in the project through D&J Installatietechniek, with whom it works closely. Ventilation with heat recovery was the requirement here, though the specific method had not yet been decided. Rodrie was involved in the engineering and came up with a suitable solution to provide the apartments with healthy and fresh indoor air.
Special roof caps
The ventilation unit (Brink Sky 200) has been installed in the bathroom, mounted on the ceiling. This is also where the duct to the roof is located, with air intake and exhaust. The ductwork in the apartments is therefore limited. It is all surface-mounted, concealed above a suspended ceiling. It was a case of trial and error and therefore a major challenge, as project manager Eduard de Jong explains, but the result is a quiet ventilation system.
Speaking of challenges: Sea Tower is getting a roof garden. Installing ducts across the roof was therefore not an option here. Rodrie has installed five-metre-high aluminium roof caps there. These are suspended from a steel structure beneath the solar panels, are colour-coated and house the supply and exhaust ducts as well as the venting for D&J’s mechanical and electrical installation. The ducts lead into two plenums within the steel structure. “This has left plenty of space on the roof for the roof garden,” says Eduard. “A unique solution: we’ve never done anything like this before.”
The power of collaboration
The solution for the roof was developed in collaboration with Interduct’s R&D department, which was responsible for the design. Robé manufactured and supplied the colour-coated raised roof caps and the insulated ducts for the shafts. Further credit goes to the installation team. Eduard: “Normally, we place a roof cap on a small platform. In this case, there were three sections, each one and a half metres long, which we then had to open up to insert the ducts. We couldn’t assemble them on the ground and hoist them onto the roof in one go, because the steel structure had already been installed. It was quite a technical challenge.” The result: an attractive solution and, above all, a sustainable, healthy and comfortable indoor climate for the residents of the Sea Tower.